Rockwell Automation 1785 PLC-5 User Manual Page 110

  • Download
  • Add to my manuals
  • Print
  • Page
    / 161
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 109
Programming Techniques
Chapter 7
7-13
When developing a program for the PLC-5 backup system, you must always
consider the following:
non-synchronous I/O scans
execution times of block transfer instructions
time for transfer of data from the primary to the secondary processor
the need to reduce the quantity of data to be transferred, and gathering all
related data into a single block
synchronization of discrete I/O data with regard to program scans even
though remote I/O scans are performed asynchronously
possibility of block transfer data changing during the scan of the program
automatic transfer of the remote inputs, such as single-transfer and remote
block-transfer data from the primary 1785-BCM module to the secondary
1785-BCM module.
the need to disable message instructions in the secondary processor using the
primary/secondary bit (local is bit 6, remote is bit 14)
Summary of Programming
Considerations
Page view 109
1 2 ... 105 106 107 108 109 110 111 112 113 114 115 ... 160 161

Comments to this Manuals

No comments