EĆ5
L0 The runbase needs to be loaded onto the rack
b0 Rack configuration is being validated
d0 Application task installation in progress
d1 Waiting on synchronizing event (in a rack with
multiple processors)
d2 Waiting on mutual exclusion lock (in a rack with
multiple processors)
Corrective action for b0 and d0 that do not change or disappear: reĆload
configuration file and application tasks.
Comments to this Manuals