138 Rockwell Automation Publication IASIMP-QS016C-EN-P - October 2014
Chapter 7 FactoryTalk EnergyMetrix Software Meter and Tag Setup
Copy Meters and Tags
Meters with the same device class and tags can be copied. It’s a real time saver to create the first meter and its tags, then use
the copy function to create the rest of the meters.
For the Efficient Industries Plant 1
example, the PowerMonitor 1000
electric meters all use the Real Energy Net, Reactive Energy Net, and Real
Power Demand tags. You will copy the Boiler House meter and tags to
create the Power House, Production 1, Production 2, and Shipping/
Receiving/DC electric meters. The tags are copied with the meter.
1. Select the meter to copy.
For this example, select Boiler House under
the Electricity group.
2. Click the Meter Setup tab.
3. Click Copy.
A copy of the meter is created
under the selected group with the
name 'Copy of Boiler House
Meter'.
4. Change the device to Power House.
5. Change the meter name to Power House
Meter.
6. Click Save.
The copied meter and its tags are created
under the Electricity group with the new
name.
7. Repeat steps 1…6, copy the rest of the
PowerMonitor 1000 electric meters.
Electric Main (PM 3000)
Boiler House (PM 1000)
Production 1 (PM 1000)
Production 2 (PM 1000)
Shipping/Receiving/DC (PM 1000)
Electricity (Group)
Data Center (OPC Server)
Power House (PM 1000)