Rockwell-automation Energy Management Accelerator Toolkit Quick Start User Manual Page 410

  • Download
  • Add to my manuals
  • Print
  • Page
    / 452
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 409
410 Rockwell Automation Publication IASIMP-QS016C-EN-P - October 2014
Chapter 13 Time of Day Control
Configure Holidays
1. Click on the Calendar Configuration button on the toolbar.
2. Configure holidays by clicking the date on the calendar.
Days configured as holidays are highlighted in purple. In this example,
May 30, 2011 (Memorial Day) has been configured as a holiday.
3. Select the left and right arrows next to the name of the displayed month to
scroll through the months and configure holidays.
4. To return to the current month, click Go to Current Month.
Override Mode Testing
1. Verify that all loads wired to your TOD controller are currently off.
Initially, all loads will be in Override Off mode by default. Prior to
configuring the load schedules and running the Time of Day control, the
loads should be tested using the override modes.
2. To set the override for each load, click the load configuration button on the
toolbar.
3. Select a load by clicking on the load number to launch the numeric keypad.
4. Enter a load number, and then click Enter.
Page view 409
1 2 ... 405 406 407 408 409 410 411 412 413 414 415 ... 451 452

Comments to this Manuals

No comments