Rockwell-automation RSLogix 5000 Fuzzy Designer User Manual Page 138

  • Download
  • Add to my manuals
  • Print
  • Page
    / 156
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 137
Publication LOGIX-UM004A-EN-P - March 2007
138 RSLogix 5000 Add-On Instruction
8. Enter parameters (operands) for the AOI.
Monitoring and Updating a
Project Online
This section provides instructions on how to:
establish online communication with a Logix controller to
monitor and tune (modify parameters) the fuzzy AOI
what to do if online communication is not working correctly.
The communication with the Logix controller is via a RSLinx
Classic OPC Server.
Before establishing online communication, certain conditions must be
met.
The fuzzy AOI is generated by FuzzyDesigner.
The fuzzy AOI is imported to an RSLogix 5000 project.
An instance of the fuzzy AOI is created in the RSLogix 5000
project.
The RSLogix 5000 project is downloaded to a Logix controller.
The order of parameters correspond to
the port order of the fuzzy project
you can optionally set it from Tools >
Set Port Order menu item in
FuzzyDesigner
The order of parameters correspond to
the port order of the fuzzy project
you can optionally set it by the
Tools > Set Port Order menu item
in FuzzyDesigner
Page view 137
1 2 ... 133 134 135 136 137 138 139 140 141 142 143 ... 155 156

Comments to this Manuals

No comments