Rockwell-automation 2711 Standard PanelView Operator Terminal User Man User Manual Page 161

  • Download
  • Add to my manuals
  • Print
  • Page
    / 292
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 160
161Publication 2711-UM014G-EN-P - September 2008 161
Chapter
10
Installing the PV900/1000 Terminals
Chapter Objectives
This chapter describes how to mount the PV900 and PV1000 terminals
in a panel or enclosure including:
hazardous locations and enclosures
required tools
mounting dimensions
clearances
cutout dimensions
installing the PV900/PV1000 terminal in a panel
Hazardous Location
Considerations
This equipment is suitable for use in Class I, Division 2, Groups A, B,
C, D; or non-hazardous locations only. PV 1000 terminals are also
suitable for use in Class II, Division 2, Groups F, G, Class III, or
non-hazardous locations. The following WARNING statement applies
to use in hazardous locations.
See the nameplate on terminal for hazardous locations certifications.
WARNING
EXPLOSION HAZARD
Substitution of components may impair suitability for Class I, Class
II, Class III Division 2.
Do not replace components or disconnect equipment unless power
has been switched off or the area is known to be non-hazardous.
Do not connect or disconnect components unless power has been
switched off or the area is known to be non-hazardous.
This product must be installed in an enclosure. All cables
connected to the product must remain in the enclosure or be
protected by conduit or other means.
All wiring must comply with N.E.C. article 501-4(b), 502-4(b),
503-3(b) as appropriate.
ATTENTION
In Class I, Class II, Class III Division 2 Hazardous locations,
the PanelView 900/1000 terminals must be wired per the
National Electric Code as it applies to hazardous locations.
Peripheral equipment must also be suitable for the location in
which it is installed.
Page view 160
1 2 ... 156 157 158 159 160 161 162 163 164 165 166 ... 291 292

Comments to this Manuals

No comments